Solar Rooftop

Torrent Power customers can process their applications for the Net Metering Rooftop Solar PV system as per “Gujarat Solar Policy-2015” and "Regulation for Net Metering Rooftop Solar PV Grid Interactive Systems vide Notification no. 5/2016".
Online link for processing application on unified portal : https://suryagujarat.ahasolar.in only through empanelled agencies

 

For attention of Solar customer and Empaneled agencies - Please note only those Solar Rooftop applications registered on Surya-Gujarat portal with all required documents by 15th Mar 2020, will qualify to get subsidy benefit for 2019-20 as declared. Details in English | Gujarati.

 

To help you learn more and get answers to your queries, we are pleased to furnish below all relevant documents, specifications and processes which you would find useful :

 

  • new

               
          Places for Submission of Solar Documents – (Zone Wise)
  •       Solar Calculator (by Ministry of New & Renewable Energy) (CALCULATE)
  •       Salient features of the Rooftop Project 19-20 (Download)
  •       Solar Net-metering Charges for Surya Urja Sceme – (Download)
  •       Empanelled Agencies – (Download)
  •       Frequently asked questions (FAQ) – (Download)
    • Government of Gujarat Solar Power Policy – 2015 (Download)
    • Gujarat Energy Regulatory Commission - Solar Tariff order 2015 (Download)
    • Gujarat Energy Regulatory Commission - Regulation for Net Metering Rooftop Solar PV Grid Interactive Systems (Download)
    • 1st Amendment dated 06.10.2017 vide Notification no. 2 of 2017 (Download)
    • Amendment-2 of EOI-SRT (Download)
    • EOI for Empanelment of Agencies for Solar Roof Top -20-7-2019 (Download)
    • GR GoG SURYA-Gujarat 05-8-2019 (Download)
    • Surya Gujarat Implementation Guideline 09-09-2019 (Download)
    1. Form for the Installation of customer own meter and guideline (Download)
    2. Bidirectional Import/Export Meter specification
      1. Technical Specification for Single Phase Imp Exp 10-60 A Meters (Download)
      2. Technical Specification for Three Phase Imp Exp 10-60 A Meters (Download)
      3. Technical Specification for Three Phase Imp Exp 20-100 A Meters (Download)
      4. Technical Specification for Three Phase LT CTO Imp Exp 100-5 A Meters (Download)
    3. Standard Meter specification
      1. Technical Specification for Single Phase Imp Exp 10-60 A Meters (Download)
      2. Technical Specification for Three Phase Imp Exp 10-60 A Meters (Download)
      3. Technical Specification for Three Phase Imp Exp 20-100 A Meters ( (Download)
      4. Technical Specification for Three Phase LT CTO Imp Exp 100-5 A Meters (Download)
  •       Pay quotation amount Click here

 

Should you have any further queries, please do email us at connect.ahd@torrentpower.com or call on our 24X7 call centre on (079)22551912 or 66551912.